Prysm 5.0.4 — signer migration
The operator intentionally stopped validator services to roll out Prysm 5.0.4 and migrate signing infrastructure. Missed duties occurred inside the signed maintenance window.
Timeline
19:00 UTCOperator posts maintenance notice for Prysm rollout and signer migration.
19:42 UTCValidator services are stopped for controlled migration.
19:51 UTCMissed duties observed while signer keys are rotated.
20:05 UTCServices return after operator-controlled rollout completes.
20:30 UTCMaintenance window closed. No provider outage reported.
Cause
Intentional operator action. The interruption is tied to scheduled maintenance, not AWS us-east-1 infrastructure failure.
Impact
Machine-readable classification
{
"kind": "OPERATOR_MAINTENANCE",
"provider_attributed": false,
"operator_attributed": true,
"malicious": false,
"excluded_under_policy": true
}
Note. This document is synthetic, written to demonstrate the kind of exclusion evidence SlashShield's GenLayer contract reasons over. No real operator or validator incident is referenced.